SISTEMA OPUESTO ACAJUTLA

###################################

 The working case has a largest mismatch of 0.0 MW at bus 27131 [ACAJ-115    115.00]

 These subsystems were specified:
   # <------- SUBSYSTEM LABEL ------>  BUSES    # <------- SUBSYSTEM LABEL ------>  BUSES    # <------- SUBSYSTEM LABEL ------>  BUSES
   1 GUATEMALA                           575    2 ESAG1                                31    3 ESAG2                                23
   4 ELSALVADOR                           27    5 ESA                                  75    6 ELSALVADORM                          73
   7 ACAJUTLA                              8    8 HONDURAS                            334    9 GUA-HON                             909

 Study system generation is         309.4 MW
 Opposing system generation is        1.0 MW
 Study system net interchange is    309.4 MW
     PTI INTERACTIVE POWER SYSTEM SIMULATOR--PSS(R)E     THU, FEB 01 2018  16:39
 SISTEMA ELCTRICO REGIONAL - DEMANDA MINIMA-2DO SEM18                    PAGE 1
 ESTUDIOS ERT 2018-2019
 ** TLTG IMPORT LIMIT OUTPUT FOR BASE CASE                                    **

 DISTRIBUTION FACTOR FILE:     G:\control\Estudios\ERT2018\Simulaciones\TLTG\2018-2019\ERT_Min2Sem18\Dfx_ERT_Min2Sem18.dfx
 SUBSYSTEM DESCRIPTION FILE:   G:\control\Estudios\ERT2018\Simulaciones\TLTG\2018-2019\subsistemas_TLTG.sub
 MONITORED ELEMENT FILE:       G:\control\Estudios\ERT2018\Simulaciones\TLTG\2018-2019\monitoreo_TLTG.mon
 CONTINGENCY DESCRIPTION FILE: G:\control\Estudios\ERT2018\Simulaciones\TLTG\2018-2019\ESA_TLTG_Cont.con

                                 PRE-SHIFT    DELTA  POST-SHIFT
 STUDY SYSTEM MW GENERATION:        309.4     -20.0     289.4
 OPPOSING SYSTEM MW GENERATION:       1.0      20.0      21.0
 STUDY SYSTEM NET INTERCHANGE:      309.4     -20.0     289.4

 <---------------- STUDY SYSTEM -----------------> <--------------- OPPOSING SYSTEM --------------->
                          <---- GENERATOR MW ---->                          <---- GENERATOR MW ---->
   BUS# X-- NAME --X BASKV    BASE   SHIFT  CHANGE   BUS# X-- NAME --X BASKV    BASE   SHIFT  CHANGE
  21101 5NOV-U1     13.800    16.9    15.8    -1.1  21136 M1-M3       13.800     1.0    21.0    20.0
  21102 5NOV-U2     13.800    16.9    15.8    -1.1
  21103 5NOV-U3     13.800    16.9    15.8    -1.1
  21104 5NOV-U4     13.800    15.0    14.0    -1.0
  21106 5NOV-U6     13.800    35.5    33.3    -2.2
  21107 5NOV-U7     13.800    35.5    33.3    -2.2
  21111 GUAJ-U1     13.800    16.7    15.6    -1.1
  21181 15SE-U1     13.800    78.0    73.0    -5.0
  21182 15SE-U2     13.800    78.0    73.0    -5.0




























































































































































































































































































 LOADINGS AT OR ABOVE 100.0 <------------- BASE CASE ------------->
 OF RATING ARE MARKED WITH '*'                             INCR.          PRE-   POST-   LIMIT
                                                           TRANS RATING  SHIFT   SHIFT    CASE    DISTR.
 <------- F R O M -------> <--------- T O ---------> CKT   CAPAB    A      MW      MW      MW     FACTOR
  27131 ACAJ-115    115.00  27411 SONS-115    115.00  1   -441.4   130    -8.6    -2.3   130.0* -0.31388
  27161 AHUA-115    115.00  27411 SONS-115    115.00  1   -581.2   128    35.9    30.2   -88.9   0.28276
  27381 OPIC-115    115.00  27411 SONS-115    115.00  1   -659.1   130     2.4    -1.6   -86.1   0.20063
  27132 ACAJ2-115   115.00  27441 ATEO-115    115.00  1   -679.3   260     7.0    14.4   171.3  -0.37223
  27411 SONS-115    115.00  27441 ATEO-115    115.00  1   -798.4   130    14.4    17.3    78.1  -0.14438
  27441 ATEO-115    115.00  27481 TALN-115    115.00  1   -877.2   260   -27.4   -20.8   117.2  -0.32754
  27361 SANT-115    115.00  27481 TALN-115    115.00  1   -890.9   260    31.9    25.3  -112.7   0.32754
  28161 AHUA-230    230.00 3WNDTR INTER 2      WND 1  2  -1172.9   149    -5.5    -7.9   -59.6   0.12250
  28161 AHUA-230    230.00 3WNDTR INTER 1      WND 1  1  -1228.1   156    -5.5    -7.9   -59.6   0.12250
  28181 15SE-230    230.00 3WNDTR INTER 4      WND 1  2  -1238.4   153   -40.5   -37.4    28.5  -0.15631
  28181 15SE-230    230.00 3WNDTR INTER 3      WND 1  1  -1238.4   153   -40.5   -37.4    28.5  -0.15631
  27381 OPIC-115    115.00  27501 SMAT-115    115.00  1  -1474.9   260   -10.1    -6.5    70.7  -0.18307
  27371 NEJA-115    115.00  27501 SMAT-115    115.00  1  -1523.7   260    19.0    15.4   -61.8   0.18307
  27321 SRAF-115    115.00  27431 SMAR-115    115.00  1  -1641.8   260    61.6    57.7   -24.8   0.19591
  27101 5NOV-115    115.00  27321 SRAF-115    115.00  1  -1942.7   260    52.3    49.1   -18.6   0.16072
  27371 NEJA-115    115.00  27171 CGRA-115    115.00  2  -2046.3   260   -37.8   -34.9    26.4  -0.14553
  27371 NEJA-115    115.00  27171 CGRA-115    115.00  1  -2046.3   260   -37.8   -34.9    26.4  -0.14553
  27181 15SE-115    115.00  27431 SMAR-115    115.00  2  -2296.9   130    36.8    35.3     4.8   0.07254
  27181 15SE-115    115.00  27431 SMAR-115    115.00  1  -2296.9   130    36.8    35.3     4.8   0.07254
  27161 AHUA-115    115.00  27351 SANA-115    115.00  1  -2874.4   129    20.4    21.1    37.0  -0.03775
  28181 15SE-230    230.00  28371 NEJA-230    230.00  2  -3294.0   396    50.2    47.5    -9.6   0.13539
  28181 15SE-230    230.00  28371 NEJA-230    230.00  1  -3294.0   396    50.2    47.5    -9.6   0.13539
  28161 AHUA-230    230.00  28371 NEJA-230    230.00  1  -3948.1   396    -5.1    -3.1    39.7  -0.10158
  28161 AHUA-230    230.00  28371 NEJA-230    230.00  2  -3948.1   396    -5.1    -3.1    39.7  -0.10158
  27181 15SE-115    115.00  27321 SRAF-115    115.00  1  -4626.9   130    30.8    30.1    15.5   0.03465
  28371 NEJA-230    230.00 3WNDTR NEJA_TR_2    WND 1  2  -5904.9   155    45.1    44.4    30.2   0.03381
  28371 NEJA-230    230.00 3WNDTR NEJA_TR_1    WND 1  1  -5904.9   155    45.1    44.4    30.2   0.03381
  27351 SANA-115    115.00  27381 OPIC-115    115.00  1  -7560.5   130     3.0     2.6    -4.8   0.01756
  27321 SRAF-115    115.00  27281 CHIN-115    115.00  1  -11669.   130     7.2     7.4    11.9  -0.01052
  27281 CHIN-115    115.00  27391 TECO-115    115.00  1  -11669.   130     7.2     7.4    11.9  -0.01052
  27171 CGRA-115    115.00  27321 SRAF-115    115.00  1  -13036.   130    -0.3    -0.1     4.2  -0.00999
  28181 15SE-230    230.00  29181 F-15SE-NNC  230.00  1  -19618.   521   -26.8   -27.3   -37.9   0.02519
  28161 AHUA-230    230.00  29162 F-AHU-MOY   230.00  1  -21085.   524    18.6    19.1    29.2  -0.02399
  28161 AHUA-230    230.00  29161 F-AHU-AGU   230.00  1  -22027.   396     2.5     2.9    10.4  -0.01785
  28181 15SE-230    230.00  29182 F-15SE-AGC2 230.00  2  -24172.   396     6.6     6.3    -0.7   0.01666

 Contingency "INTR GUAT MOY" has 1 bus(es) not connected back to a swing (type 3) bus
 Using a full dc network solution

 Contingency "INTR GUAT LVG" has 1 bus(es) not connected back to a swing (type 3) bus
 Using a full dc network solution

 Contingency "INTR HOND NNC" has 1 bus(es) not connected back to a swing (type 3) bus
 Using a full dc network solution

 Contingency "INTR HOND AGC" has 1 bus(es) not connected back to a swing (type 3) bus
 Using a full dc network solution

 Contingency "SANA-GUAJ" has 5 bus(es) not connected back to a swing (type 3) bus

 Contingency "SMIG-HAVI" has 5 bus(es) not connected back to a swing (type 3) bus

 Contingency "LUNI-HAVI" has 2 bus(es) not connected back to a swing (type 3) bus

 Contingency "SMAR-SBAR_DOB" has 4 bus(es) not connected back to a swing (type 3) bus
 Using a full dc network solution
     PTI INTERACTIVE POWER SYSTEM SIMULATOR--PSS(R)E     THU, FEB 01 2018  16:39
 SISTEMA ELCTRICO REGIONAL - DEMANDA MINIMA-2DO SEM18                    PAGE 2
 ESTUDIOS ERT 2018-2019
 *** TLTG IMPORT LIMIT OUTPUT FOR SUBSYSTEM ESAG2                            ***

 SOLUTION OF  52 SYSTEM CONDITIONS ATTEMPTED      0 INSOLUBLE SYSTEM CONDITIONS

   INCR.                                                                    PRE- RATING
   TRANS <----------------- LIMITING ELEMENT ----------------->   DISTR.   SHIFT BAS/CNT
   CAPAB <------- F R O M -------> <--------- T O --------->CKT   FACTOR     MW    A/A  <------------------ CONTINGENCY DESCRIPTION ------------------->
  -270.1  27131 ACAJ-115    115.00  27411 SONS-115    115.00 1  -0.50000    -5.1  130.0 CONTINGENCY ACAJ-ATEO

 Output completed