
###################################

SISTEMA OPUESTO ACAJUTLA

###################################

 The working case has a largest mismatch of 0.0 MW at bus 14319 [THP-400     400.00]

 These subsystems were specified:
   # <------- SUBSYSTEM LABEL ------>  BUSES    # <------- SUBSYSTEM LABEL ------>  BUSES    # <------- SUBSYSTEM LABEL ------>  BUSES
   1 GUATEMALA                           575    2 ESAG1                                31    3 ESAG2                                23
   4 ELSALVADOR                           27    5 ESA                                  75    6 ELSALVADORM                          73
   7 ACAJUTLA                              8    8 HONDURAS                            334    9 GUA-HON                             909

 Study system generation is          24.6 MW
 Opposing system generation is      182.8 MW
 Study system net interchange is     24.6 MW
     PTI INTERACTIVE POWER SYSTEM SIMULATOR--PSS(R)E     THU, FEB 01 2018  16:39
 SISTEMA ELCTRICO REGIONAL - DEMANDA MINIMA-1ER SEM19                    PAGE 1
 ESTUDIOS ERT 2018-2019
 ** TLTG IMPORT LIMIT OUTPUT FOR BASE CASE                                    **

 DISTRIBUTION FACTOR FILE:     G:\control\Estudios\ERT2018\Simulaciones\TLTG\2018-2019\ERT_Min1Sem19\Dfx_ERT_Min1Sem19.dfx
 SUBSYSTEM DESCRIPTION FILE:   G:\control\Estudios\ERT2018\Simulaciones\TLTG\2018-2019\subsistemas_TLTG.sub
 MONITORED ELEMENT FILE:       G:\control\Estudios\ERT2018\Simulaciones\TLTG\2018-2019\monitoreo_TLTG.mon
 CONTINGENCY DESCRIPTION FILE: G:\control\Estudios\ERT2018\Simulaciones\TLTG\2018-2019\ESA_TLTG_Cont.con

                                 PRE-SHIFT    DELTA  POST-SHIFT
 STUDY SYSTEM MW GENERATION:         24.6     -20.0       4.6
 OPPOSING SYSTEM MW GENERATION:     182.8      20.0     202.8
 STUDY SYSTEM NET INTERCHANGE:       24.6     -20.0       4.6

 <---------------- STUDY SYSTEM -----------------> <--------------- OPPOSING SYSTEM --------------->
                          <---- GENERATOR MW ---->                          <---- GENERATOR MW ---->
   BUS# X-- NAME --X BASKV    BASE   SHIFT  CHANGE   BUS# X-- NAME --X BASKV    BASE   SHIFT  CHANGE
  20301 SOYA-G1     4.1600     1.0    -0.3    -1.3  21136 M1-M3       13.800    39.1    43.3     4.3
  21041 GCSA        13.800     1.0     0.1    -0.9  21137 M4-M6       13.800    28.8    33.1     4.3
  21101 5NOV-U1     13.800    16.6    12.6    -4.0  21138 M7-M9       13.800    48.3    52.7     4.4
  21111 GUAJ-U1     13.800     1.0    -3.0    -4.0  21139 TPTO-G1     13.800    66.6    73.6     7.0
  21371 NEJA-G1     13.800     1.0    -0.4    -1.4
  21372 NEJA-G2     13.800     1.0    -0.4    -1.4
  21373 NEJA-G3     13.800     1.0    -0.4    -1.4
  21481 TALN-G1     13.800     1.0    -2.9    -3.9
  21482 TALN-G2     13.800     1.0    -1.0    -2.0




























































































































































































































































































 LOADINGS AT OR ABOVE 100.0 <------------- BASE CASE ------------->
 OF RATING ARE MARKED WITH '*'                             INCR.          PRE-   POST-   LIMIT
                                                           TRANS RATING  SHIFT   SHIFT    CASE    DISTR.
 <------- F R O M -------> <--------- T O ---------> CKT   CAPAB    A      MW      MW      MW     FACTOR
  27131 ACAJ-115    115.00  27411 SONS-115    115.00  1   -279.2   130    45.5    51.6   129.6* -0.30128
  27161 AHUA-115    115.00  27411 SONS-115    115.00  1   -433.8   127   -24.9   -29.6   -90.5   0.23499
  27132 ACAJ2-115   115.00  27441 ATEO-115    115.00  1   -458.7   260    77.6    85.6   188.6  -0.39744
  27411 SONS-115    115.00  27441 ATEO-115    115.00  1   -459.7   130    46.6    50.2    97.2  -0.18153
  27381 OPIC-115    115.00  27411 SONS-115    115.00  1   -509.3   130   -35.3   -39.0   -87.2   0.18605
  27441 ATEO-115    115.00  27481 TALN-115    115.00  1   -510.4   259    31.6    40.6   156.3  -0.44642
  27161 AHUA-115    115.00  27351 SANA-115    115.00  1   -982.4   129    27.8    29.8    56.6  -0.10321
  27351 SANA-115    115.00  27381 OPIC-115    115.00  1  -1268.5   130    -8.8   -10.7   -35.4   0.09531
  27361 SANT-115    115.00  27481 TALN-115    115.00  1  -1489.4   260   -28.7   -31.8   -72.0   0.15530
  28161 AHUA-230    230.00 3WNDTR INTER 2      WND 1  2  -1761.5   148   -31.9   -33.2   -50.3   0.06589
  28161 AHUA-230    230.00 3WNDTR INTER 1      WND 1  1  -1878.1   156   -31.9   -33.2   -50.3   0.06589
  27381 OPIC-115    115.00  27501 SMAT-115    115.00  1  -2498.5   260    33.3    35.1    58.6  -0.09074
  27371 NEJA-115    115.00  27501 SMAT-115    115.00  1  -2607.4   260   -23.4   -25.2   -48.7   0.09074
  28371 NEJA-230    230.00 3WNDTR NEJA_TR_1    WND 1  1  -2635.0   155    31.0    31.9    44.1  -0.04699
  28371 NEJA-230    230.00 3WNDTR NEJA_TR_2    WND 1  2  -2635.0   155    31.0    31.9    44.1  -0.04699
  27101 5NOV-115    115.00  27321 SRAF-115    115.00  1  -3051.1   260     4.9     3.2   -19.3   0.08683
  27181 15SE-115    115.00  27321 SRAF-115    115.00  1  -4251.4   130    18.1    18.6    25.4  -0.02621
  27321 SRAF-115    115.00  27431 SMAR-115    115.00  1  -4500.3   260    25.1    23.8     7.4   0.06332
  27371 NEJA-115    115.00  27171 CGRA-115    115.00  2  -5087.3   260    -2.0    -1.0    12.3  -0.05151
  27371 NEJA-115    115.00  27171 CGRA-115    115.00  1  -5087.3   260    -2.0    -1.0    12.3  -0.05151
  28161 AHUA-230    230.00  28371 NEJA-230    230.00  2  -6439.2   396    13.3    14.5    29.9  -0.05942
  28161 AHUA-230    230.00  28371 NEJA-230    230.00  1  -6439.2   396    13.3    14.5    29.9  -0.05942
  28181 15SE-230    230.00 3WNDTR INTER 3      WND 1  1  -8293.0   153    -3.6    -3.2     1.7  -0.01890
  28181 15SE-230    230.00 3WNDTR INTER 4      WND 1  2  -8293.1   153    -3.6    -3.2     1.7  -0.01890
  27171 CGRA-115    115.00  27321 SRAF-115    115.00  1  -12055.   130    -1.6    -1.8    -4.6   0.01065
  27321 SRAF-115    115.00  27281 CHIN-115    115.00  1  -14055.   130   -18.1   -18.3   -20.3   0.00796
  27281 CHIN-115    115.00  27391 TECO-115    115.00  1  -17948.   130    12.9    12.7    10.6   0.00796
  28181 15SE-230    230.00  28371 NEJA-230    230.00  1  -33251.   396    17.7    17.5    14.2   0.01243
  28181 15SE-230    230.00  28371 NEJA-230    230.00  2  -33251.   396    17.7    17.5    14.2   0.01243
  27181 15SE-115    115.00  27431 SMAR-115    115.00  2  -61098.   130    18.6    18.7    19.1  -0.00182
  27181 15SE-115    115.00  27431 SMAR-115    115.00  1  -61098.   130    18.6    18.7    19.1  -0.00182
  28181 15SE-230    230.00  29181 F-15SE-NNC  230.00  1  -62796.   521   -31.9   -32.0   -34.0   0.00779
  28161 AHUA-230    230.00  29162 F-AHU-MOY   230.00  1  -66968.   524    27.7    27.9    29.8  -0.00742
  28161 AHUA-230    230.00  29161 F-AHU-AGU   230.00  1  -69985.   396     9.5     9.6    11.0  -0.00552
  28181 15SE-230    230.00  29182 F-15SE-AGC2 230.00  2  -77528.   396     3.3     3.2     1.9   0.00515

 Contingency "INTR GUAT MOY" has 1 bus(es) not connected back to a swing (type 3) bus
 Using a full dc network solution

 Contingency "INTR GUAT LVG" has 1 bus(es) not connected back to a swing (type 3) bus
 Using a full dc network solution

 Contingency "INTR HOND NNC" has 1 bus(es) not connected back to a swing (type 3) bus
 Using a full dc network solution

 Contingency "INTR HOND AGC" has 1 bus(es) not connected back to a swing (type 3) bus
 Using a full dc network solution

 Contingency "SANA-GUAJ" has 5 bus(es) not connected back to a swing (type 3) bus

 Contingency "SMIG-HAVI" has 5 bus(es) not connected back to a swing (type 3) bus

 Contingency "LUNI-HAVI" has 2 bus(es) not connected back to a swing (type 3) bus

 Contingency "SMAR-SBAR_DOB" has 4 bus(es) not connected back to a swing (type 3) bus
 Using a full dc network solution
     PTI INTERACTIVE POWER SYSTEM SIMULATOR--PSS(R)E     THU, FEB 01 2018  16:39
 SISTEMA ELCTRICO REGIONAL - DEMANDA MINIMA-1ER SEM19                    PAGE 2
 ESTUDIOS ERT 2018-2019
 *** TLTG IMPORT LIMIT OUTPUT FOR SUBSYSTEM ESAG2                            ***

 SOLUTION OF  52 SYSTEM CONDITIONS ATTEMPTED      0 INSOLUBLE SYSTEM CONDITIONS

   INCR.                                                                    PRE- RATING
   TRANS <----------------- LIMITING ELEMENT ----------------->   DISTR.   SHIFT BAS/CNT
   CAPAB <------- F R O M -------> <--------- T O --------->CKT   FACTOR     MW    A/A  <------------------ CONTINGENCY DESCRIPTION ------------------->
   -90.6  27131 ACAJ-115    115.00  27411 SONS-115    115.00 1  -0.50000    84.3  129.6 CONTINGENCY ACAJ-ATEO
   -96.8  27411 SONS-115    115.00  27441 ATEO-115    115.00 1  -0.40700    90.6  130.0 CONTINGENCY ACAJ-ATEO
  -232.6  27131 ACAJ-115    115.00  27411 SONS-115    115.00 1  -0.34748    48.8  129.6 CONTINGENCY ATEO-TALN
  -251.6  27161 AHUA-115    115.00  27411 SONS-115    115.00 1   0.33078   -43.6  126.8 CONTINGENCY ACAJ-ATEO
  -255.7  27131 ACAJ-115    115.00  27411 SONS-115    115.00 1  -0.31735    48.5  129.6 CONTINGENCY SANT-TALN
  -258.0  27161 AHUA-115    115.00  27411 SONS-115    115.00 1   0.36066   -33.8  126.8 CONTINGENCY ATEO-TALN
  -261.9  27131 ACAJ-115    115.00  27411 SONS-115    115.00 1  -0.30707    49.2  129.6 CONTINGENCY NCUS-ATEO
  -266.3  27161 AHUA-115    115.00  27411 SONS-115    115.00 1   0.32138   -41.2  126.8 CONTINGENCY OPIC-SONS
  -267.7  27131 ACAJ-115    115.00  27411 SONS-115    115.00 1  -0.31735    44.7  129.6 CONTINGENCY SANT-NEJA
  -272.3  27131 ACAJ-115    115.00  27411 SONS-115    115.00 1  -0.30707    46.0  129.6 CONTINGENCY NCUS-STOM
  -274.4  27131 ACAJ-115    115.00  27411 SONS-115    115.00 1  -0.30128    47.0  129.6 CONTINGENCY SMAR-SBAR_DOB
  -279.2  27131 ACAJ-115    115.00  27411 SONS-115    115.00 1  -0.30128    45.5  129.6 BASE CASE
  -280.9  27131 ACAJ-115    115.00  27411 SONS-115    115.00 1  -0.30707    43.4  129.6 CONTINGENCY SMAR-STOM
  -282.5  27411 SONS-115    115.00  27441 ATEO-115    115.00 1  -0.26439    55.3  130.0 CONTINGENCY AHUA-SONS
  -293.6* 27131 ACAJ-115    115.00  27411 SONS-115    115.00 1  -0.29288    43.7  129.6 CONTINGENCY AHUA-NEJA_DOB
  -299.7  27411 SONS-115    115.00  27441 ATEO-115    115.00 1  -0.24089    57.8  130.0 CONTINGENCY OPIC-SONS
     PTI INTERACTIVE POWER SYSTEM SIMULATOR--PSS(R)E     THU, FEB 01 2018  16:39
 SISTEMA ELCTRICO REGIONAL - DEMANDA MINIMA-1ER SEM19                    PAGE 3
 ESTUDIOS ERT 2018-2019
 *** TLTG IMPORT LIMIT OUTPUT FOR SUBSYSTEM ESAG2                            ***

 * MONITORED ELEMENTS OCCURRING     10 OR MORE TIMES

   NO. <----------------- MONITORED ELEMENT ----------------->
 TIMES <------- F R O M -------> <--------- T O ---------> CKT
    12  27131 ACAJ-115    115.00  27411 SONS-115    115.00  1

 Output completed
